Development of the oil rim of the Urikhtau field during pilot operation (Phase 2).
Expansion of the DNC with the installation of gas drying, construction of the DNC-UGPU Kozhasai gas pipeline with KUUG, fuel gas pipeline with AGRS.
List of construction of new facilities:
- Gas Pipeline
- Expansion of the DNS with the installation of gas drying
- Fuel gas pipeline
Contract Number: AG №17 to Contract №45
Place: Aktobe city O /f «Urichtau»
Period: 2021
Contract price: 5 855 901 411 KZT